返回

外贸英语·订单之路30篇(3)

6 / 30

正在确认阅读权限…

Final Inspection Passed: All Goods OK

Final Inspection Passed: All Goods OK

终检通过:全部货物合格

  1. QC tested 200 pieces from the full batch.
  2. They checked size, color, stitching, and packaging.
  3. Only two shirts had loose buttons — easy fix.
  4. After repair, all items met AQL Level II standards.
  5. Lisa reviewed the report and signed the release form.
  6. She sent photos and test results to the buyer.
  7. The buyer said, 'Great job. Please prepare packing.'
  8. No rework needed — time to move to packing!

试读结束

该书不支持试读,请购买后阅读完整内容

点击购买 ¥19.9
上一页
/ 30
下一页