返回

跨文化贸易沟通·订单连载30篇(1)

7 / 30
已读 0 / 30 课
Final Inspection: Pass or Hold?

Final Inspection: Pass or Hold?

终检放行:合格或暂扣?

  1. Three days before shipment, Wei Lin returned for the final AQL Level II inspection on 1,200 units, sampling 80 pieces per ANSI/ASQ Z1.4.
  2. He measured handle thickness, tested hinge durability on 10% of spatulas, and verified barcode scannability under four lighting conditions.
  3. One carton failed—the inner box label omitted the CE mark, though outer shipping marks were correct.
  4. Lisa contacted the packaging vendor, who rushed replacement labels and reworked the carton within 6 hours.
  5. She updated the client with a photo of the corrected label and a note: 'All units now comply with EU Directive 2014/30/EU.'
  6. The inspector issued a clearance report with zero major defects and one minor correction fully resolved.
  7. Lisa uploaded the signed report to the client portal and marked the order ‘Shipment Ready’ in ERP.
  8. Clear criteria and documented corrections made the ‘hold’ decision objective—not emotional.
上一页
/ 30
下一页