When does the schedule start if the source file is password-locked?

2026-01-20 02:00:34

The schedule starts when the source file opens and someone can work on the text. Arrival of a locked file is a delivery of a container. The days of translation and review are counted from the hour the password works and the pages are confirmed to be the right pages. A locked file can sit in the inbox all week without the schedule having begun.

A zip arrived on Thursday with the installation manual inside and a password dialog on top. The password was in a different thread, between two people who were out on Friday. The file was “received” in the project list, and a plan that started the clock on Thursday showed the translation as late on Monday morning, when the password finally arrived and the zip opened. Nothing had been late. The start had been written on the wrong day. Monday morning, when the pages opened and matched the expected manual, was the start.

Receipt and start are two timestamps

Record both. Receipt is when the container landed, so nobody can say the file was never sent. Start is when the work can be done: the password is in, the file opens, the text can be copied or legitimately extracted, and a person has looked at the first pages and seen the document they expected. A corrupt zip, a password that opens a different document, or a file that still needs a second key has not started.

Write the start in the mail back to the client, in one line, with the date and time. That line is what the later schedule is measured against. A plan built only from the Thursday receipt will call a normal job late, and then everyone will argue about effort when the real issue was the locked container.

What can happen while it is locked

People can clear the schedule, line up the reviewer, and read any unlocked reference the client already sent. They cannot count words they cannot see, settle a glossary from a hidden chapter, or promise a delivery date from a page count in the accompanying email. Page counts in emails drift. The open file is the count that enters the plan.

If the password is delayed, say what the delay does to the delivery date, in the same unit of days the work needed. Do not absorb the locked days into the translation days and then discover the gap on the evening the file was promised. The locked days were never translation days.

How to send a file so the clock can start

Send the password in the channel you said you would use, to the person who opens the project, on the same day as the file. Name the file the password belongs to. A password in a separate thread with a vague subject will wait until someone searches, which is how Thursday became Monday. If policy forbids putting the password in the same channel as the file, send it immediately afterward and confirm it opened.

Once it opens, the schedule is ordinary: the volume, the review, the delivery date, counted from that opening. The Thursday zip can stay in the receipt log. It does not get to be the start.

What if only one of several files is locked?

Start the unlocked files, and keep the locked file on its own start time. A project date that pretends the whole set opened on Thursday will blame the open files for a delay that belongs to the locked one.

Does a file that opens but displays as blank count as started?

No, start requires text someone can work on, and a blank open or a cover with nothing behind it is still a blocked file. Confirm a real page, then start the clock.

The related service page is translation services.

Quick FAQ: AI Translation Accuracy

  • How accurate are AI translators? Accuracy is often high for repetitive or general content, while domain-sensitive content still needs expert review.
  • How to improve AI translation quality? Use glossary control, domain prompts, QA checks, and human post-editing in one workflow.
  • Where does human translation still win? Legal, medical, and high-stakes brand content usually requires human nuance and accountability.