Production Kickoff: Syncing Timelines
投产启动:时间轴对齐
课文音频
Listen to the full story · 完整逐句/整段音频可在解锁后使用。
您仍可先看下方课文摘要;在阅读器可查看该书试读与权益说明。
课文
从第 4 课起,导读页仅展示部分正文,便于您了解难度与风格。
-
Lisa convened a virtual kickoff meeting with the factory planner, QA lead, and her own logistics coordinator using a shared Gantt chart.
-
She displayed critical path items: raw material arrival (Day 3), first-line assembly (Day 12), mid-production inspection (Day 20), and final packing (Day 38).
Unlock full vocabulary & bilingual guide · 完整课文、逐句音频与全部译文请在解锁学习权益后于阅读器中查看。