外贸英语·订单之路30篇(5)
3 / 30
正在确认阅读权限…
Factory Audit Scheduled: Building Confidence Through Transparency
安排验厂:用透明度赢得信任
-
EcoHome requested an on-site audit before signing the contract, citing their internal compliance policy.EcoHome以内部合规政策为由,要求签约前进行现场审核。
-
Our QA manager, James, coordinated with their third-party auditor to fix a visit date next month.我方质量经理詹姆斯协调其第三方审核员,确定了下月的访问日期。
-
He prepared digital files covering fire safety records, worker training logs, and environmental permits.他准备了涵盖消防记录、员工培训日志及环保许可的电子文件。
-
The factory floor layout, QC checkpoints, and raw material traceability system were pre-recorded for remote preview.工厂车间布局、质检关键点及原材料追溯系统已预先录制,供远程预览。
-
James also scheduled a live video walkthrough for key areas including soldering, assembly, and final inspection lines.詹姆斯还安排了焊接、组装和终检产线等关键区域的实时视频巡检。
-
To avoid delays, he shared English-language SOPs for every major process in advance.为避免延误,他提前共享了各主要工序的英文版标准作业程序(SOP)。
-
We highlighted recent improvements—like LED binning control and automated aging tests—that exceeded industry standards.我们重点展示了LED分光管控、自动老化测试等优于行业标准的最新改进。
-
The audit scope explicitly excluded financial data but included subcontractor management practices.审核范围明确排除财务数据,但涵盖分包商管理实践。
-
All documents carried the batch ID 0017-003 to ensure version control and traceability.所有文件均标注批次号0017-003,确保版本可控、全程可溯。
-
This proactive approach helped turn a routine check into a strategic relationship-building moment.这一主动举措将常规审核转化为战略性关系建设契机。